🔧 Terratech Mods — Page 17
TerraTech Steam Workshop mods — browse, subscribe, and play. 14,446+ free mods.
14,446+ mods · Free downloads · Install guides included · 29 pages
📂 Browse by Category
⭐ Hand-Picked Best Mods
2026クレッセントシップ
LASER TANK v5
a version far superior of my previous laser tank
war plane
无畏式陆战突击车 喷射耗子TC101
阿橘重工 十芒星越野卡车
十芒星全地形越野卡车,推力25500吨,动力强劲
自动门Automatic Door mk8
When the detector is triggered for the first time, open the door, and when the detector is triggered
Cannon of Harima Mk2
個人の方がyoutube、twitterにて主催してくれているBB1000万イベント用の艦その2 https://youtu.be/jQL67IXCCPg 前イベに出てたCannon of Harim
AGS Frontier Base
This item has been tested with TerraTech v1.4.19. *** This item requires all of the following other
Energy Inversion bl
This Will Most likeley Destroy the mission : energy inversion bowl
JF23Vc4 VTOL aircraft
Tank Craftory
Armored tank mobile crafting base for on-the-fly crafting in dangerous environments. Has all fabrica
The Lemon Juggernaut
This tank was built to win. It obliterates everything in its path in 1 shot. Great for multiplayer!
B1_5g
ブリューナク 改
ウチアゲ
Wide Lemon Core
This is an epic core for your next creation! This core has everything you need to build your tank or
Blackbird L2
X3雷鸣 BMF
造型机
障害物競争
lemon castle
AAA WUNDER
"AAA WUNDER" from "SHin Evangelion" or "Evangelion:3.0+1.0" . i like this AirBattleShip so much.
NT Army MSCU
»New Army Mobile SCU« Tech is anchored, anchoring inactive techs (when there is lot of them in rende
PUI PUI Molcar "Potato"
PUI ('Y' ('Y')
Base all in one
Base tout en 1pas trop encombrante : - Chaîne de montage - Boutique de toutes les corpo - Chaîne de
小隼突擊艦2021
2021年 新規改裝 小隼 艦艏加長 艦橋新規化 搭載反重力引擎操作變靈活 多樣化武裝 也可以自行 變化 多重複合式充電功能 能快速 把電充滿 強化電容量 保證夠用 加裝了 不管怎樣 有裝上去就是帥的
SuperZero Jet
Fast jet with lots of fire power
KR bural Battleship
【生産終了】SJ725-100C【貨物機】Sky:Jetstrike Company
旧型式 JET20C /GalaxyCARGO 最大積載量 総積載可能ブロック数:約1000 GSO資源ブロック:訳220個 GEO資源ブロック:約50個 BF資源ブロック:約170個 HE資源ブロッ
GK 工蜂
无人机蜂群,按X分离部署 UAV group, press X to deploy.
RB_79_BALL
big bird
Zumwalt Class Destroyer
Model : DMS-DTR-01 Manufacturer : Darvenstein Military Shipyard Displacement : 9699.90 metric tonnes
自走砲
大型輸送機
Mini 4WD
Speed 103km/h Boost 141km/h DPS 9,000 - 18,000 MegaReactor Battery x 2 use (subscribe) "Rafs' Skins
野牛
以拾荒者為核心改造 高火力戰艦 高速移動 靈活轉向 多重武器 搭載 及高效率充電 系統 打家劫舍必備好艦!!
Gecki missile
This version of my Gecki reverse-hoverbug is perfect for running the Reticule Research Zero Point Ho
BGR VTB HoverCopterVTOLPlaneBomber
It's a Hovercraft+Copter+Bomber Plane Hybrid. A Bhomvercrofpter? Nope, that doesn't work... Well the
73式 normal skin
色はデフォルトに戻しておりますので好きな色に変えて遊んでもらえればうれしいです!!!
Iron Box v2
This is a VTOL disguised as a land battleship. It can take off by pressing the up↑ key.
Bigfoot
Hello there! This is a representation of the tech shown in the Terratech wallpaper, enjoy this littl
Hover Ball
Armored hovercraft with mega battery. Anchor to deploy solar panels. Can double as AI turret.
Ope Laser Cylinder
STC Budget Flight
Gets you from A to B as cheaply as possible, featuring disposable wheels to help you take off. Top s
blimp
Co_Op_Creative_Save
very very high
spawn at 120,000 ft
HL Defense Tower
You need to put these towers around the base.
starter turret
Venture Pest FR
Tiny airframe, too many rockets and fuel tanks. You can lay this one back and perch it on the backsi
Mobile Crafting Base
Cause my pc is not skynet-like i made this mobile compact crafting base. You can harvest, scrap and
Ястреб
Данная птичка маневренная, обтекаемая и способна уничтожить любую воздушную и наземную технику одним
the king of the salt flats
this big boi has some real big stuff! just run at someone, watch them go through the blades, none wi
sky base prototype
a prototype of what i think the air rigs were supposed to be used for untill the "sky ancor" the air
Wall Eve
pew pew looks spooky
tiny bomber
this tiny package of destruction is very easy to fly and doesnt pull in any direction when flying.
flying by the recoil
flying by the recoil
Xenon Bike
A small bike with a top speed of 140mph. You can use the boosters to take off and fly.
Decent Starter
Get it while it's hot!
Speed Hunter
Max speed 300km/h!!!!!!!!!
Mobile Factory
Do you lead a nomadic lifestyle? Do you tend to get chased halfway around the world by the nearest h
wierd fast car
the quad copter
Tiny flying scout
its like my previous tiny scout but it can now fly and its adorable seeing it in the air
Modern Plane
A somewhat commercial plane that handles extremely well and has weapon attach points
TIE fighter
The smallest
Calisto Cruiser
BA07C Rastaban
Hover-Tech with bipedal dinosaur motif 二足恐竜をモチーフにしたホバーTech <機体情報> 第7世代 C型(C=Circuit、回路による特殊動作を有するモデル
RH17n3E
The Beast
K 堡垒装甲车
Snowman
Bob the Boomer
ВСРАТОФОРТРЕСС
攻击1111 B
攻击1111(B)遥控无人机,攻击111的加大版,外观参考的中国人民解放军的攻击-11无人机,在专用遥控器操控下可以实现更多功能,在普通遥控器下也可以实现基础操控。使用21-30(B)频段 注:建议使
HE Neo FT17 R3
Minor update. *This item has been tested with TerraTech v1.5.3.
Memory Module
The memory module is a piece of circuitry that is capable of storing and retrieving a single number.
HR02
D77 TC
PETER car 12s
A Asalt car with busters that last 12 seconds
rMRV02C
Nuclear Submarine
HUGE SUBMARINE ! fires nuclear missiles and has 2 torpedoes launchers, u need a lots of block ! like
StarCraft ProtoType Siege Tank
this tank has 3 control module. 1. vehicle steering 2. turret rotation 3. siege cannon angle adjustm
ワンショットジオにゃんクラッシャー
分離すると近接火力担当の前ユニットに操作が切り替わります 後方のにゃんにゃんは援護射撃してくれるハズです・・(A)の機嫌次第)
轻型轰炸机
Astro四連掘削機Mk2
AMOGUS
#built_by_me
GSO Cannon Turret
A perfect mix between durability and firepower.
MiG 21
my own modded version of a good old MiG 21
DeLorean Flying
Mods used: High Capacity Fuel Tank https://steamcommunity.com/sharedfiles/filedetails/?id=2437123492
GSO compact Factory
A compact GSO factory that can fabricate and automatically sell extra materials.
Savage Coffin 2
【生産終了】SJ935-100E【座席付き】Sky:Jetstrike Company
旧型式 JET30E こちらは、先代機 https://steamcommunity.com/sharedfiles/filedetails/?id=2375691949 SJ935-100型機のファ
Beginner Plane
This plane is really easy to fly, and is really cheap
DeFab Tower Complete
A fabrication tower with a small footprint and pretty much all the things you will need. This is a c
Derelict
Alien Covenant Derelict weaponized!!!
hedghog AC sniper
long range config of the hedgehog.
Tempest Mk II No RR
Vette
The Vette is a co-op capable (only version 1.3.12.5 or later) variable height hovercraft with a pric
Fire Phoenix by Lee
Fire Phoenix, my first tank.
Heavy Tank
This is for those that want a Tank platform that dominates without relying on missiles. Features Gun
Fast plane 230mph
F1 V3
Simple update of my previous F1 V2. Top speed 153 mph
TyX hover power
surpass enemies with power of type 45 and two turrets. Someone sneaking up behind you? no problem! m
直升机
STARWARS RepublicAttackGunship/LAAT
For transporting resources.
【生産終了】SJ935-100【座席付き】Sky:Jetstrike Company
旧型式 JET30 貨物機をも凌駕する圧巻の超巨大機体! 基礎性能は先代JET20Xをもとに作成されており 座席数は従来より50%増加したほか、客室上部に貨物室を完備 少々見た目が不格好ですがTerr
TANKEKY TANK TANK
very fast for a tank
Better Future Jet
Please leave a comment and tell me if any of my work needs some improving. Thanks!!!!!!!
Combat Scrapper
turn on the filter (marked as off) to work the furnas, anchor the scrap, it will sell everything you
ChandrBerthalet1
Funny helicopter with a big Bertha Забавный вертолёт с большой Бертой (Ver. 1)
Invincible Hover "Fort Brawny"
My idea of an Invincible Hover Tech. Not too Heavy to handle, either. You can use Down Arrow to fine
BF SkyHopper Mk4a
Upodated SkyHopoper Tech with many more engine groups and a top speed over 120mph
[MISPLACED BLOCK] Awesome House
Unfortunately, I cannot edit Workshop submissions and as such I have to make a new one to change a m
Dolphin
Dolphin is a discontinued jet that was used to infiltrate hawkeye's base during the faction wars. No
Pod Racer Type Ship (STAR WARS)
I built this based on photos the pod racer from star wars(anakins pod)
Battle Ship - Ion Boost Destroyer V2
FLY EVERYWHERE DESTROY EVERYTHING I add some UI and Barriers which fully cover hovercraft Also add r
USS Enterprise
Aircraft carrier. venture typhon jet is recomended
ATTACK helicopter
FLIES FOR FUN
Junkers Ju 88
フロンティア00 Type2B
Turet base 2T
Press X and see whats going on :) hopefully works good.
EXP Ramp Truck
EXP Ramp Truck with interior access!!! Take a single GSO cab and use your build beam to go up the fi
ATTACKER
Geocorp APE
despite being sold by Geocorp Enterprises, the APE (all purpose explorer) is actually a joint ventur
F_18 Hornet v3
Beast the Collector
Heavily Armed and Shielded Gatherer and Scavenger Wechicle
fasty
fast and fun to drive and stund feel free to edit the vehicle
Warthog Heli
This is a replica of an A10 Warthog, I had to give it helicopter blades because it could not get off
Snow Fall V3
The V3 version of Snow Fall, this one is a heavy bomber with a decent speed and very sizable payload
atomic rocket reaper
Factory Optimized
Light Bomber Mk2
Remember that old bomber that I made, super cheap but only had a couple mortars on it's bottom? Well
Venture Twin-Jet Bomber
Is your fleet in need of a lightweight, fast, cheap, and agile bomber? Look no further than Venture'
Absorb IFV
Arquitens Class Cruiser
The Arquitens Class Command Cruiser form star wars. The perfect ship to command your fleet at a safe
F_35 A
操作性はF-14と一緒です 双発機になったが許せ
ゴローニャロボ
再現機体 ゴローニャロボ です。 見ての通りアレです。ポケモンの再現機です。 一応最低限の戦闘力は持たせた機体になっていると思いますが、御使用時はお好みでカスタムしてお使い下さい。 動画に使用してもO
k_khorizon
racing
fighter
small cheap fighter what else can be said
YB49a3 BL
A modded version of my YB-49, using BL AM25000 jets and BL Valflame Plasma Clusterbombs Uses Black L
Acrobatic Bus
A bus filled to the brim with adjustment thrusters. What could go wrong? This bus is very agile and
朽ちた大和
遠征に行った大和行ってみたら見方は全滅していた.・・・・・・・・そして味方を助けた大和はα帝国本土に帰ろうかしていたその時敵艦の待ち伏せにあったのだ、、、、
飞机7
Qiyue DT2B GeoCorp Mining Tower
水上偵察機
偵察機です。
Mudrock
艦艇ドック大
大和サイズまでの艦艇までなら収納可能。GSOメガトンキャノンである程度自衛できる。バッテリーはなし!(大問題)
世紀末カー そのに
航空タンカー ヘッドハンター
かつて物資の輸送に使われていた超大型航空艦。現在は改修され、簡易的な航空戦艦として使われている。 ※注意! この車両はNSV block modのブロックを使っています! ダウンロードする際には必ずそ
GeoCorp MINER
NT Army TruckT2
»New Tech Army Truck Type 2« Tech is anchored, anchoring inactive techs (when there is lot of them i
The anzwer head
head!!
WK mk1
ベンチャーバイク
Fortress
This fortress is truly a tough cookie to take down. The immense amount of shields, weapons, and batt
Flying Wing A1
A fuel-powered high-speed & long range transport aircraft.
Red Nighthawk
One of my combat planes, using the new skins
富嶽 修正版 fugaku
super bomber
good for long range bombing
Vindicator
A helicopter with a diverse set of weapons. Standard helicopter controls, shift for acceleration and
Chase and Erase RW
The new and improved version of Chase and Erase, need I say more? Yeah... The skins will probably ge
fast
Ball Maze
A simple ball maze. Use a glitched better-future ball to act as your navigator. Using WASD you can m
VK 100.01 (P)
TIPS: Don't forget to press "X" when spawn, be sure that you are on a flat terrain The tower will ro
new track 06_15
Tank with MT-Hoover Tracks
death star
GK Football Game
这是一个足球赛多人游戏,限于游戏联机的限制,只能最多支持2v2对战,快和你的朋友们一起踢足球吧!!! 注意,球员有两种行动模式,可以按C键切换: 带球模式,正向走路,速度较慢,可以用前叉推球,按空格键
TerraTech Kossr 7783
JET
les piss
a les paul guitar that can move
Grawitу Tank Star Wars
Longhorn
This is a high mobility small tank equipped with rare parts "HG1 Cannon Turret (Alt)". It can be obt
lathlands shotguner
it shotguns things
Star Travler
The fastest of the star series (fly out of range af enmeny fire to avoid geting destroyed)
Dreadnaught MK1
Hover bug warship.
Spire Hanger A18
Has a detachable plane inside, a huge rotating turret a little under a 100 ft tall.
A1
能开的1m30s
新型戦艦
mega base
Sky PlatformMK3Edge
A platform. This is an edge module used to assemble modular platforms. The video shows how to assemb
Dragon
The Dragon is a superheavy airship that is larger that build limit so it is in 2 parts(search for Dr
missle
have you ever wanted to blow up a hover craft or take out a base. well then my missle is for you all
FLY destroyer
BetterOsprey (Modded)
A true tilt-rotor aircraft. W & S for controlling lift, arrow keys for pitch and roll, and + & - on
TURRET
Jet 1
Very easy to fly and have fun :D
Venture Striker Mk X "Mjolnir"
Turret S
It is the size of one barrier field of GSO.
MegaCharger
The MegaCharger can charge much faster than the R&D charger, but it takes a while to boot up, and ha
BomberHeli V2
A decent sized helicopter. It flies like a heli would, and it feels easy to control. Doesn't look to
missles
an overpowered killing machine
Platform Area
Large platform area
Not-A-Plane
Use your Tractor Beam in order to get this plane ready for takeoff. Note: This sucker uses boosters
Mobile factory
Scrap and charging station 48~64mph
JagPanzer
Another addition to my WW2 collection. The JagPanzer a medium german TD.
Nightglider
Fast, stable, and powerful
Int Rotor Heli MK IV
A super stable, weponized helicopter with internal Rotors. It has very good amor and batterie for a
GeoCorp Overlord Cab
crazy jet
Maniac Buggy
SJ Vulture R2
Delivery Garage LOW
awesome all round garage built mainly for my (Behemoth Collector) but can be used for all vehicles.
LDA DefBattleTower
ALS002
TerraTech Worlds上线以后原本删了。 但现在看来十分有必要把这个项目永久保存在创意工坊里。 只使用了Hawkeye方块;无裸露锚点;无方块挪用。 巡航速度:115km/h 加力速度:14
185kGeCoヘリ
Raptor Mk.1
Working Rubik's Cube using c&s
LAG WARNING When loading it in, the game may appear to freeze / blue ring of death. Leave it for a m
ユーエフ00
ツラナル
空中艦 コウミョウ
動画終盤の改造された方です
CSH 02
sky breaker
W3pound AssaultMini2
CN171
XP-82 12.7mm
ゼールグロー
https://steamcommunity.com/sharedfiles/filedetails/?id=3162583196 ↑ ゼールクロー二番のURL
探検バギー2号
Police 02
Early Game Base
Delta 801 BX
Sport car is coming! 新型スポーツカー登場! 各種クロスコープスキンが必要です 2021/7/31現在 unstable版が必要です
GT002 industry
This is a spaceship and is a base.He could theoretically build anything
NT Army TruckT2 CBx
»New Tech Army Truck Type 2 Close Box« Tech is anchored, anchoring inactive techs (when there is lot
THE PEACEMAKER(Mad Max: Fury Road)
Big Black Bird
Le BBB ou Big Black Bird est mon 1er test pour un gros coucou bien dodu et dans ce jeu il est diffic
The answer body
body!!
GM Kai Upper
The RGM-79C GM Type C (aka GM Kai) is a mass production mobile suit, appears in an anime "GUNDAM". W
ゼールクロー二番
https://steamcommunity.com/sharedfiles/filedetails/?id=2749018275 ↑ ゼールクロー一番のURL https://steamcommun
StreamJet
SHIFT: Vertical takeoff Down Arrow: Soft landing
AIRWOLFぽいのホバー機
GK 暗月A
升级版暗月,垂直起降,速度更快
Endurance
A moderately well equipped helicopter/gunship, it has high maneuverability with its short but powerf
Dynamo charger
this is a simple dynamo charger that you can put on a geocorp pole it will spin around in circles an
ムスペルヘイムver0.8
Ver0.8 側だけしか作ってません。中身は今のところありません。 鋼鉄の咆哮シリーズより超兵器、超巨大航空戦艦「ムスペルヘイム」竣工 両舷の航空母艦を分離すれば超巨大レーザー戦艦「グロースシュトラー
Hawk Heavy Fighter
A meddium bomber/intercepter crossbreed god at taking out most targets and getting away unscathed.
Heywood Class Frigate
Model : DMS-FRT-02 Manufacturer : Darvenstein Military Shipyard Displacement : 4436.16 metric tonnes
Des Moines class heavy cruiser
BigFootOnlyVenture
Большеколёсный монстр с ракетным вооружением, состоящий их блоков только лицензии Venture
Hyperionought
school bus
KV 2
Stalin approves.
Window
This is special canard aircraft.
Manticore
Successor: v4 https://steamcommunity.com/sharedfiles/filedetails/?id=2063192407
Working Unobtainables
Xenocraft HVX1
Edoc Armories Inc. LLC released a modified version of an Alien hover craft we captured. The tech see
biggest
this is one of the biggest tech I could make. firing it can crash your game.
ホバー戦艦改
The Great Building
5x5x5 Craft Cube
A 5x5x5 base that can craft anything. It can do lots of things besides craft like move.
Megabox
A hovering harvester tech. Very fast and easy to maneuver, where "Up" and "Down" can be used to cont
HoverGod
Welcome to the HoverGod. She has tons of missiles of basically every type. She also has many slug th
Scrap selling machine スクラップ高額売却君
不要なブロックや敵ブロックをそのまま現金化! Unnecessary blocks and enemy blocks are simply cashed! 画像の通りに部品メーカーを設定したらドンドン
boat
MODDED PARTS a small boat
Venture Pest X4D
Dual Double Rockets and EIGHT cruise missiles for Exxxxtra umph! Beefier fuel tanks as well. This is
Twin Head v2
Solar panels have been added instead of rear armor blocks, and thrusters have been repositioned to f
BF airplane plus
a plane to survive in and more weapon space at the bottom
Lunch box Unit 1 v3
Lunch box Unit 1 v4 https://steamcommunity.com/sharedfiles/filedetails/?id=1679168350
Lunch box Unit 1 v4
Sergeant Smash
FutureTruck
A full Better Future conversion of the MegaTruck (Also on my Steam Workshop: https://steamcommunity.
BASE MOBILE
tech che può: fare tantissimi danni vendere risorse raffinate in movimento, andare abbastanza veloce
for a better future
HOVER
a good fighting HOVER/base
tiny turret 05
world fast
really fast thing
GK Fuel Power Tower
Charge your tech at a high rate ! Request Hawkeye compressed mineral . I suggest use it in create mo
Rocket Ship
non stearable rocket that needs new wings each use
200 MPH
I used this tech to get the Speed Demon Achievement
early game vehicle
early game allround vehicle (fighting, transport and resource gathering)
f1
Fabricator Base
Just put your resources in and craft away!
My VentureSpitfire
This time I was inspired by Polyblank's "VentureCorp Spitfire": https://steamcommunity.com/sharedfil
Rocket
Can fly
Markstech AT
The markstech is a long rang tech destroyer armmed with 4 main railguns in the center. Its rather sm
ISS V2(Weaponized)
The original version of this was Imperial Star Destroyer I just put alot of guns on it
Strongman
Sheer Strength This tech has it all: Weapons, power, armor, and style.
P38 Lightning
Quick Mockup of a P38 Lightning "Copy" in venture theme, Complete with Nose Mounted Guns. Take-off a
Jet Bomber
6000ft effective range. works entirely on jet power
me to
J7W Prototype
Smallest version of J7W that i could build Its a quite hard to fly with it
Resource harvester
FB turret
Glasteel 玻璃钢 AVP
Edited by AI,This is definitely not because I have run out of inspiration.
Onyx-2
Description - The Onyx-2 represents a class of uprated artillery frigates. Built upon an A25490 star
Player Tech 5
charging base
main target in pvp
fly wbs
oma und opa mod
MegaTruck
Combat Truck, good All-Terrain vehicle with plenty of firepower and sustainability.
SNAKE
Nokia Snake Game Save
超簡単ミサイル
置くだけで発射されます
限定旋回砲塔:自動照準機能実用モデル
従来アヴァランチやGSO4連装ミサイルポッドで行っていた回転砲塔は限定旋回に対応しておらず、更に旋回速度も遅かったのですが、本機はそれを克服しており、極めて高い精度の旋回とスラスター追加による旋回速度
Falcon Superfrigate
Very agile 4.7m frigate, with more guns then comparable 8m-cost ships by other factions. The Falcon
UH290A Brigard
The successor to the UH98 Orikan, The UH290A is a medium transport capable of VTOL. It is capable of
セイバータイガー
ゾイド -ZOIDS- より、セイバータイガー になります。 シールドライガーに比べてバッテリー量は少ないですが、旋回性能や移動速度は勝っているので、 機動戦闘を心掛けて戦えば、かなり役立つと思います
ラフタークレーンCRFORCE I
1式星間航行レールガン搭載戦闘艦
Missle Truck
Venture Discount Air
Easy build plane just under 14000 BB, flys level ascending slowly.
High Tech Tank V2
HWK Chimera Bomber
This Chimera jet is outfitted with flares that double as missles, bombs, and BMB missile launchers t
MECH
ガンダム 4号機
機動戦士ガンダム外伝 宇宙、閃光の果てに… より連邦軍のガンダム4号機になります。 武装はシンプルにライフルとビームサーベルと機銃を少々、といった具合です。
航空戦闘艇 スタッグ
新しいTechの形、「航空艦」のサンプルです。 ...似たようなのが既にあったらすいません。 ー操作方法ー W、Sでピッチ操作、A、Dでヨーイング操作、Q、Eでローリングです。
Mobile Base
Work in Progress of Mobile base
大型ホバー艦 ストリーカー
大型のホバー機。 頑丈で強力。
ドリフト仕様 Mintia SDR【軽トラ】SQ MOTORS.Ltd
Roly poly 2
红警2 自爆卡车
自爆卡车是《命令与征服:红色警戒2》中利比亚的特色武器。属于自杀性武器,爆炸时就像三分之一颗核弹一样,但是唯一缺点是任何可攻击单位均为它的天敌。 The self detonating truck i
NOVA ATV-II
With the recent development of the new NOVA Shredder turret, the versatile NOVA ATV-II has hit the p
B1 Centauro
Fast but fragile
Max speed 195 without boost but with its 235 Not great with sharp turns
Compact factory
GK 无齿翼龙
自动飞机,AI专用,可以根据地形自动调节高度,全地形通用,用作空中支援僚机。 前几天在创意工坊看见一个日语名字的分体载具,大致读简介说能放无人机,好奇订阅了一下,结果出乎意料的烂:用了轮反,只不过这人
super fab
SSP02
Early game plane, made it before i got 3 GSO tail blocks
Beginner V3.5
Is able to anchor on the go Decent battery level Plenty of armament Good shielding and repairs Has M
star wars AAT
Air A
CFA 44
my cfa44 i took 2 hours to make
Manticore hover type
Avion1
Aardvark Tactical Vehicle v1 (there is an updated version)
UPDATED VERSION HERE https://steamcommunity.com/sharedfiles/filedetails/?id=1988971204 The Aardvark
refined n raw store
stationary storage/crafting base, i made it cheaply it will be easy to add hawkeye and better future
Harvester
easy to fly plane
an cheap and easy to fly for many that cant handle the flying controls
1級戦闘艦 宇宙戦艦ヤマト改
前作の物を改良してみました。良かったらどうぞ^^ 操作性と電力維持の為、艦内に発電機を搭載してみました。 (電力変換出来ない資源は売却します) 兵装として爆弾と両舷のレーザーを若干追加 使ってみた感想
ChandrTankChassis3
Chassis for very large tanks with GeoCorp axle and experimental bearings Ходовое шасси для очень бол
Venture Podracer
An awesome tiny podracer that uses totally not bugged blocks to keep itself together! Also is able t
VP AG1 DustfeederX
A Hawkeyed version of the Dustfeeder, for that ultimate Venture Pest experience. So light that it ca
X 3421 Ion Bolt
When the Diolysis corporation first announced project ion bolt, no one was sure what would transpire
h c u p
helicoptero-de-combate-ultra-pesado muy eficas contra bases y enemigos grandes
flying
なんJファイター7
HarvestBase001
B2 Stealth Bomber
Flies with default areoplane controls. Some looks had to be sacrificed for function.
BIG Battle Bot
GEO mech
Hell Its About Damm Time
Assault strike HC
this version doesnt have shields or batteries but you can easily add them in if you wanted to.
fear the B O X
F E A R T H E B O X
Golden Gun (Left)
The Golden Gun, probably the thing I'm most known for tech wise. An old 100+ block long landship tha
ultimate starter
DESERT FORT
PERMENANT/TEMPORARY - base of operations /field modifications and repair in extreme safety whilst be
base base001
Defence Beyblade
Like the others ive made, but this one likes to defend itself from attacking beys. Please desighn an
mining huler
warning if recorces are stuck inside tech just sit in build mode for a bit
Anti-air-air fortress with berthas
weird hovercraft with alot of guns and even more hovers it can fly
Factory
Rocket Wing
Campaign plane. Has few of each rockets from game. Balanced flight useful for long voyages. To use i
Galatic Explorer
A tanky scout that can reach very high speeds while also being able to defend itself.
RAMROD Rock Buster
Check yourself in to Alternative Mining with the RAMROD! This beast works just like it sounds - RAM
Little army
A bounch of little ai guards that get released when you press "X". You need a good pc for this
mini plane 4
Titan Racer
One of the largest and most rediculous looking venture techs ever
PreExotic Crafting
Basic crafting system with a lot of Storage and scrappers, Pre-Exotic componants
Jato hover venture
HG1 Alt Firefly
As you all know, this long-barreled HG1 can sometimes be obtained from enemies, but it becomes invis
Pufferfish VHS1
Vertical Hover Shuttle Gen 1. 233 km/hr. Precision Vertical Landing. Shuttle will auto level vertica
70式戦車最新型油圧サス搭載
我が帝国のラインアルタル社の新型油気圧サスペンションを搭載した70式戦車です! (車操作でのピッチアップ、ダウンで補助をしておりますなのでピッチアップ、ダウンキーをQ、Eに割り当てる事をおすすめいたし
batman vs hephata 1
VE Speed Demon Mk4
The cruising speed is 280 and the maximum speed is 285. ※This item has been tested with TerraTech v1
ヴァンガード1
Super Turret
Стоит Специальный Админский Щит "ПРОТОТИП"... Такой тока в пве квестах На миссиях попадается! А Тут
BattleCruiser
zeppelin_b3_war
its like the zeppelin_b3_peace but now weaponized :) controlls are still a bit difficult and acceler
fast monster
good for dunes!
Underground Craftory
Complete crafting base with all six corporation fabricators and scrappers, plus the new Custom Corpo
舰艇68
对火力有需求可在两翼搭载8导弹挂架或拆除装甲,改了下键位小键盘7.1上升下降
RH14
light helicopter
Dump Truck
geocorp sheild
by the way this is not moded
attack helicopter
small attack helicopter with good control.
Top Fuel Drag Star
RACE CAR
monster geocorp
ガンタンクモドキ
過去の遺物
USR Ka 50
Orbiter
halo star ship
列車砲
砲塔が動くよ
Moth Drop ship
The moth is a medium/large supply transport dropship designed to ferry supplies and small techs betw
monster
PererabOnlyVenture
Собиратель, переработчик и продажник на очень быстрой ходовой с серьёзной ракетной защитой. Аппарат
Roomba of Doom
K 公仔弓箭手
T32B
Cost reduction
sell sell sell
Player Tech 60
-Server -FPS -PC rocket platform
CompactMobileCrafter
Has all fabricators and all scrappers in a super dense layout (based on ZG CompactAllCrafter https:/
Sand Crawler
Star Wars inspired Base/NPC Trader. A simple design that includes a Trade terminal, SCU, and a Scrap
Autominer/bricker early game
Name says it all, it mines, it turns them to bricks, it sends them to inventory. Gso only license.
super speed
BGR M6 Tipsy Howitzer
Incremental angle adjustment(Q&E) with solar generators for independant deployment. Can scale steep
THE cube
Destroyer of Worlds
This is an improved design based off of "MY DOOR TO HELL". It has plasma cutters angled towards the
Hellion MK5
Falcon MK1
Axis-6 - change to buttons "R" "F", change 2nd block rotation to "H"
mid-late game tank tech
not cheap but it'll get the job done
BF SkyHopper Mk2b
Light armor Unit 1 v2
Завод
Преработка ресурсов, создание кредметов (не полная, 3 фракции)
Wave Cyclone
WaterBike based off of the Wave Cyclone from Sonic Rush Adventure. Uses Water mod.
Attack Bike
Based off of the Nod scout from the Command and Conquer Series. An agile missile bike strong in grou
Sleek Flying Car
You have to hit a small bump to start flying, it will not takeoff naturaly
FastScav 2A
TT1.0 campaign. Scavenge all tech, mobile furnaced. 70 + clicks on the grass.
base
A small chep bace ,reupload as you wish.
FlyingPigTank v2
Faster, turns better, and has a better nose & tail than v1
Speed Demon (ACHIEVMENT)
this design is pretty sleek. I could have done much better but it gets the job done. Ideally, use th
GeoCorp MegaHauler
A miner, with a very large physical cargo capacity. and megatons for some reason.
LEVIATHAN
simply balanced
The Brick
This Is a series of conveyor belts and furnace generators, refineries, and delivery cannons all put
Hover Carrier
An 8 hover carrier. Only made to look good, doesnt have much firepower, no shields. Steering is hard
Venture Plane
A Cheap, Fast, and Affordable Plane! (Except for the rockets, but you can switch those out for somet
plane
HELICOPTER
The Marauder
The Marauder is a hawkeye tank build with 4 hawkeye repeater rifles, 2 hawkeye machine guns and a ha
PTT LightHouse
The PTT (pretty tank thing) Light House is a powerful tank designed by me. Pros: - Has a large amoun
Tiny tank
runway
good stationary landing pad
MobileBase
ATTACK PLANE
Very good attack plane but expensive
attacker1
WZ211
ALT+C 将Better Future Rail Piston中的Max Velocity(change rate)改成任意数值,Target Value(position)改为0.5使炮塔居中。数
Space Battleship
AGS Interceptor R1
AI patrol missile v1
Automatic activation when enemy approaches Attention: occupying channel 0
Forest Grinder
Type-20 MBT R
20式の主砲をレールガンに置き換えたモデルです。基本性能やキー操作は20式と変わりません。 20式のリンク↓ https://steamcommunity.com/sharedfiles/filede
A 40
例の空飛ぶ戦車であります。
strv 103 b fix
1 button-raise your ass 2 button-lower the ass 3 button-return to the original position 4 button-rai
アルジオン級空中戦艦
この空中戦艦は、敵国の空中戦艦に対抗するために作られました。半重力エンジンを使用し重い機体を軽くし飛ばせるようにしています。圧倒的な耐久性は、全ての砲弾を受け止め、圧倒的な火力で相手を打ちのめします。
Canterlot MCV G1
One of Ministry of Wartime Technologies' most complex construction, It is a complete version of "Sol
Cirrocumulus
A reasonably fast destroyed armed with an absurd amount of missiles. Features a few cannons this tim
Tiny car
Very cute.
CTB1
Speed 62mph
GEOCORP DRONE MARK10
this is vanilla no mods
Silent Barrier MKI
Drone Launcher & Relay Truck Mods used (for the custom paint as seen in the picture(s) - All Corps -
tank4
TITAN
MEGA cargo plane
海盗1
AMX 30 R [RECORRECTED]
Here is the AMX 30 that I redid in a more futuristic version, the turret is operational and can be a
Antimatter
A better future with Venture. This attack copter is a joint Op between two of the flight powerhouses
UGA AB-43D Stinger
The AB series is an Attacker-Bomber series of aircraft. This variant has 4 Missiles but no pulse gun
Prelynnicius
The Prelynnicius class is a gunboat frigate, with high amounts of ballistic and laser armament. Prel
一式陸攻
前より操作しやすくなりました
一式陸攻 Complete land attack
Treasure Chest
宝箱です。 中には資源がごそっと入っています。 もし敵として出会えたらちょっとうれしいかもしれません。 ※PCの動作が重くなるので注意です。 MOD 下記のMODを使わせていただいてます。 Rafs'
M1A2 Abrams
M1A2エイブラムスです
VI号戦車ティーガーII
mortal engine v3
a super tanky hovercraft with inspiration from Mortal engines
Half Track Camo Green
A half track with a anti tank/air cannon more likely based around Russian but I just made this up. P
OverMyDeadBody_MK3
Police helicopter
警察ヘリです、イメージしたモデルはBell-47です。 拙作のパトカーや白バイと併せるつもりで作成しましたが、メインローターの大きさから全体サイズを決めた為にスケールが小さくなってしまいました。 傾斜
Terra XXL Shuttle (Singleplayer)
「Mysterio」 use in sumo mode
機体名:ミステリオ(ユニット相撲用) コントロールユニット以外はBetter Futureのパーツを使用しています。 ホバーはあまり強くないので車両にしました。 タイヤが破壊されても走行できるように多
Flying Puffer
SUPER ULTIMATE MIKE
Hawkeye Explorer
Gunpod Sentinel [Splitting Tech]
Starter
Multi Fabricator
一般路过炮塔
试试怎么样才能摧毁这个疯狂的炮塔! 搭载200+矿业电池 16x10x4门mk3战列舰大炮 加装了一圈风速导弹发射器 还有200+的太阳能发电机(早上几乎无敌) 转的超快
90式v2c
NWO with Mayfly v2 [Splitting Tech]
This is the flagship of "MozuTech fleet". The hover-pod has been connected for peripheral exploratio
Ope Mobi Fab Apex
Previous tech was deleted and uploaded again this might occur again if I find things that I think sh
The Nightmare
An unarmed airliner built using Better future blocks. Adjust completely.
ウェーブライダーMk5改
Charging Station
Charging Station
Sky PlatformMK3Mid
A platform. This is a centre module used to assemble modular platforms. The video shows how to assem
heavy mech unit V2
a FLYING MECH
やぐら3号 v2
Frontier Mk VII
Dump Truck
Auto Miner x4
Mobile fortress
A mobile fortress with heavy armor, shields and fire power, press to hover over opsticals or press t
VTOL Osprey
F_18 Hornet
collector
Cheap venture plane
Vindicta
Hovercraft design based on the Vindicta destroyer spaceship from a game called Dreadnought.
Hybrid
A cross between Hawkeye and Venture tech, really advanced speed jet with missles
Recharging Station v1 (works at night time)
This this can recharge more than 10 Geocorp batteries (yellow ones) in under a minute. It has batter
GK snail
press shift to fly
THIS IS THE VEHICLE FOR YOU
10000009000000000
IJN Mod
This mod is a work in progress. Things might get added, or they might not. The quality is low. This
Robot Inner Frame (Sample)
This tech was prepared to explain how to build a robot using the Control Blocks mod. Therefore, some
地対空超大型要塞 ECRIPS
F1
ジェットは搭載していません 200kmほど出ます
ΩRhine
前衛武装宇宙艦 zzzアンドロメダ改
宇宙戦艦ヤマト2202
hybrid venture scout
awesome at climbing, and it can even fly! armed with mortars and guns. and has a repair bubble that
Laser_Boom
Утиль GeoCorp
月面探査機
分離すると、それぞれのタイヤが別々に動き、荒れた地形を乗り越えやすくなります
Cloudsdale MCV
Ministry of Wartime Technologies' most complex construction, It is an complete version of "Lunar Pri
hover
BT10 Stealth Drone
The BT10 Stealth Drone is a continuation of the BT8. Don't worry i made both the BT8 and the BT10 al
Jormungandr
A massive Capitalship that boasts overwhelming firepower.
How to Install TerraTech Mods
How do I get started with TerraTech mods?
Subscribe on Steam Workshop. Mods auto-download and install. Launch the game to activate.
Are TerraTech mods free?
Yes. All mods listed here are free downloads. We link to the official pages.
What are the best TerraTech mods for beginners?
Use the sort dropdown above to find the most-endorsed or highest-rated mods — these are community-tested and ready to go.